 鲜花( 30)  鸡蛋( 0)
|
本帖最后由 爱城一粒沙子 于 2015-7-29 16:33 编辑 7 O$ y! b: o- X5 d' P; R4 Y2 S- I
I* G! C$ `$ W K* _: r" H
Journeyman Electrician1 T. e; c1 l4 Y/ \ a6 n4 l
Total Number of Positions: 20 Positions Filled: 16 High Number: 103939 TRAVELER-2; ^8 i$ N5 r( A9 G( ^
Contractor: Norcan Electric/ O# N3 u, Y" }6 p* G" u
Location: Syncrude Maintenace (Base Plant)5 g& l8 q% [* |
Description:
+ S2 P( Y) w: xDay shift, Start ASAP, 1 Week plus, 4/10's (May change to 10/4), Report after callout, Orientation to be confirmed, Working under the Maintenance Agreement, No beards, Own transportation, Camp provided if no residents, Industrial rate.6 s# N9 B3 u; Q" R: A
Pre-Requisites / Conditions: Pre-Access D&A (Active RSAP Site), CSTS, Heavy Lifting, Bending, Pulling, Climbing, Working at Heights, Must Have 2 Way Radio Communication Experience, Confined Space/Fall Protection/Mask Fit/H2S Alive/ First Aid/AWP & EHT Experience Preferred.
2 Q0 W) x. I0 }# G7 L+ Y; K) ZOpen Date: 07/22/2015+ C8 p: J4 l8 T l+ }
Close Date: 08/31/20154 j- Z6 j9 ` l1 K( N& }3 i3 \# a
Job #: 441 |
|