 鲜花( 1)  鸡蛋( 0)
|
Procedures for building Garage
1.Concrete Foundation:6 p6 y8 [) q8 [9 w0 X- F/ Q& b
a.land Flating: Need roller and pressor and get earth compaction index to civil technical requirement
8 e5 s! t4 H5 W2 U5 ~b.Footings: need about 16"x8"footing reinforced with 3-15M steel Rebar continuously and 15M transverse rebar at 12" spacing
: }8 i3 q& g0 X' Xc. Concrete wall: about 8" wide by 36" heigh reinfored with 15M vertical rebar at 12" spacing and 3-15M horizontal rebar 7 a; t# j& f d8 B9 C' |
d. Slab: about 5"-6" slab reinforced with 10M rebar at 12" spacing each way
" \: s& f& p" n% x' I5 U, u! Ue. order concrete mix from Lafarge or Inland concrete ready mix ' }- Z, o4 b- y& f% a, a
f.pour concrete first footing, wall and last slab.
5 R- T. m4 w1 @) j/ Z( B' ]. C/ Z, X1 _* h
After 3days later (better 7days) you can start framing with wood and dry wall, and insulatin materials M8 ~$ |9 t1 d
2 F; B% } u4 [4 vAll of them you need have roughly design and sketch. Estimate materials. |
|