米乐 发表于 2014-6-24 22:12 ( F- V; a: u X- U- c" @6 r
一共就两次walk through,第一次就说了railing有问题, 然后就是最后一次walk through,发现完全没看图纸 ... 8 m+ u3 a* l" u0 A
Did you ever follow up with the builder?
( n+ ?6 ]' w6 U5 C# @0 \) OI would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through.7 H7 F5 s/ N- N3 Y, Z- N: R0 l
It is too late to talk about this now.
4 g1 |) D0 G( @: F0 aIf you have everything documented, show it to the lawyer and ask for hold back.
+ a, k' U& G; R( @7 @$ }# E/ H5 o6 p1 f! s! y- w
If you can live with the wall, ask the builder to compensate you instead of removing the wall.. W3 W9 {/ e/ A, A* p4 U! | U