3 I+ u. N9 ] B) h3 A, ?8 I+ S- l一共就两次walk through,第一次就说了railing有问题, 然后就是最后一次walk through,发现完全没看图纸 ...
0 M) e8 ]1 U7 F# ` O' RDid you ever follow up with the builder?
, C, b# G+ F K# pI would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through.$ ]# ]- A* L0 e/ u6 N
It is too late to talk about this now.
, }) B3 s5 B3 |8 iIf you have everything documented, show it to the lawyer and ask for hold back.
8 D5 V, B5 T2 H9 \1 ~
' C' _: i6 y p/ TIf you can live with the wall, ask the builder to compensate you instead of removing the wall.5 d/ U% x2 X1 \
It will be messy after you move in and they come back to take down the wall. |
|