足球看完了来看看题目。
2 x7 g7 u" k& w8 }! G
* C# f2 |, l. L6 S9 b3 E$ t9 J$ @7 pThe length of the heat trace is 22 meters. The size of the heat trace is 5/16 inch (WATTS/ m SUPPLIIED is 43.7); z0 X! S; i: }5 Z6 p$ G- M
The drawing is shown as figure 1. (All data is from the memory. They are not the same as the real drawing, but a little bit different). U$ d- q, H* b4 K6 G/ {( g2 l
We can see it is not easy to install the 22 meters heat trace according as figure 11 h9 i& y3 E w; \6 l+ e
/ Z6 ]8 y. Z3 W8 O
. ^9 L/ A. ]1 n7 j, p) Z
7 R, {. v/ C" z6 |" o
+ b, z: Y" N5 g) [9 `& x H- `As a normal question we just discuss:
( K. v l# |; fHow do you run these 9.4 meters heat trace (size 5/16 inch) on the 3 inches 1.4 meters pipe ?
5 d' l6 |+ l5 S" @, {I call this is JACK LAI Spiral Method 螺旋法4 A! B1 o9 y5 \. b9 F' a
The outside circumference of the 3 inch pipe is more than 10 inches. See figure 2.6 l- N/ t8 m% j- E4 H, H
There are 10 positions to plac the heat trace. They are 0.1,2,3,,,,,9. The distance between each position--heat trace is about one inch.
[) t" V; _" \- sBecause the pipe is horizontal, position 0 can not be placed. See figure 2# S: z* i5 {* k, o% @
Because the maximum bend radius of the heat trace is 2 inches( see note 1), position 5 can not be placed. See figure 2. Then the route of the heat trace can be like figure 3
5 a- \" K* X A, }& B% G) V" X$ GThe total heat trace that can be installed here is about
: J5 ]. q; z5 _% P: o _% X$ s1.4 * 6 + 1 * 2 = 8.6 + 2 =10.8 Meters- }/ }8 m6 F t& M9 R& V
So, the 9.4 meters heat trace can be installed along the 3 inched 1.4 meters pipe without a problem.
/ t( r* E" O! X9 d0 {. `& {$ ~) C& W! K
Note :* l9 _- G, `, N
1. The minimum bend radius:( v% ~% F B! r( {
Because the heat trace size here is 5/16, 6 times the outside diameter of the heat trace is
9 T0 K5 G8 ? b0 T" i+ `. F5/16 *6 = 30/16 almost = 2 inches( u7 g8 V4 [9 [7 z# K2 I3 j+ @
So the maximum bend radius is 2 inches.0 H. ^4 ?/ b/ v0 ^4 D% ^" P
( q1 ]3 T, e" x+ N/ H8 M4 H! @
! z2 t1 u% N) U' ~. ]
$ d# v9 g( j8 m, M" T: p8 ASummary$ t* U0 X c9 E. @( d! m/ w4 _2 {
As regular
1 b! [/ H/ E. _$ \For 3 inch pip: If heat trace size is 5/16 inch, and no RTD, the box position is close to the end of pipe. 1 meter long pipe
& A, D' O. u; I* Gif the pipe is horizontal, The length of heat trace can be installed is about
# F+ E( A0 X! P% k* ]5 o1 * 9 = 9 meters1 C. A( }$ t; J4 C7 ?$ y0 T# Z
If the pipe is vertical, The length of heat trace can be installed is about9 d0 H& v" W+ R
1 * 10 = 10 meters.
" e7 v P8 J$ L: EFor 2 inch pipe: If heat trace size is 5/16 inch, and no RTD, the box position is close to the end of pipe. 1 meter long pipe, g3 ?! B/ |" I, S7 t* }
if the pipe is horizontal , The length of heat trace can be installed is about) m( \' t: W+ D
1 * 4 = 4 meters
* B a q' e& `% M9 tIf the pipe is vertical, The length of heat trace can be installed is about5 D/ R. r+ R" b) G$ h
1 * 5 = 5 meters. |
|