米乐 发表于 2014-6-24 22:12 
5 s( q) \3 ]! {4 \一共就两次walk through,第一次就说了railing有问题, 然后就是最后一次walk through,发现完全没看图纸 ...
* N7 H; W* X/ J8 i: @3 s$ T$ MDid you ever follow up with the builder?
4 x9 E" }* `0 N# q$ pI would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through.
" U6 @. a; g7 I {% B5 tIt is too late to talk about this now. V" \, k7 I" h0 I( T" |7 \) f5 j* o
If you have everything documented, show it to the lawyer and ask for hold back.
) Y. g4 n* P, x+ @, h+ u8 b- S: S6 a7 @7 I. I2 N8 I; C
If you can live with the wall, ask the builder to compensate you instead of removing the wall.
; k# ?$ m- E/ S {" Q; Y6 SIt will be messy after you move in and they come back to take down the wall. |
|